The weightage for the Risk level is added in this tab. When you access the E&M Calc in charting for a specific encounter, the Risk Level Weightage field in the Level of Risk section will display the value based on the configuration done here. The risk level (Minimum, Low, Moderate, or High) can be selected from the E&M Calculator screen.

To configure risk levels:

1.On the E & M Configuration Screen, click the Risk Level Configuration tab.
2.Select the Risk Level as Minimum, Low, Moderate, or High from the drop-down list.
3.Select the Weightage as 1, 2, 3, 4, or 5 from the drop-down list.
4.Click Save. The details are saved.
5.In the Risk Level Configuration tab, click the edit icon INSYNC~1_img796corresponding to the risk level to edit the details.

 

clip0637